Home  |  About Us  |  Our Services  |  Our Portfolio  |  Photo Gallery  |  Occupational Health & Safety  |  Contact Us

Commercial Pipe Installation

Sub Menu

Pipe Installation Perth

ArrowOur Projects
ArrowPipe Installation
ArrowPre Insulated Pipe

Contact Details

Pipe Installation Perth

Email:

To contact administration please send emails to admin@commpipe.com.au

Address:

Unit 3, 14 Fallon Road Landsdale
WA 6065

Phone:

(08) 9302 2370

Fax:

(08) 9302 2418

Location Map

Commercial Pipe Installation Balcatta
 

Case Studies

Pipe Installation Perth

Burswood Peninsula Tower 1

The peninsula apartment development is a Mirvac apartment development overlooking the Swan River at Burswood, consisting of a number of apartment towers and low rise apartments and town houses.

Commercial Pipe Installation involvement on the project was on Tower 1, on the installation of a loop cooling water system, serving air conditioning units in the apartments which are served by from a heat exchanger, cooling tower and boiler plant located on level 17 & 18.


HBF House

HBF Health Fund’s office building in Murray Street, Perth underwent a total refurbishment of the air conditioning systems, while still functioning as an operational office building without affecting the client’s staff and operation of the business. A new chiller and boiler plant was installed with new pipe riser and AHU plants installed on a floor by floor basis.

Commercial Pipe Installation’s involvement on the project was to install new chilled & heating water pipework.


Joondalup Shopping Centre

Lakeside Pipe Installation

The existing shopping centre has undergone an extensive upgrade. Located in the heart of Joondalup, this project comprises a major expansion to the existing Lakeside Joondalup Shopping City. The expansion of Lakeside is a two storey extension comprising of an additional 29,000 square meters of retail and office floor space, with the addition of a Big W Department Store, an IGA Supermarket and 100 new specialty shops.

Commercial Pipe Installation involvement on the project was to install condenser, chilled & heating water pipework from an upgraded chiller / cooling tower plant and a new boiler plant, to serve the new specialty shops, food court and malls.


CSIRO Waterford

At CSIRO Waterford the project consisted of an expansion and extension to the existing Koch and Becher Buildings. Works included a three-storey extension to the Koch Building, new administration wing, extensive laboratory fit out and re-configuration and the construction of a link bridge between the two buildings.

Commercial Pipe Installation’s role in the expansion was installing new chillers and associated pumps for CCW and chilled water. Our team also worked on the Laboratory gases including vacuum, compressed air, nitrogen, CO2, argon and oxygen.


Submarine Facility, Henderson

Henderson Submarine Facility Pipe Installation

The state-of-the-art facility represents a consolidation of all Western Australian submarine maintenance and upgrade activities.

Our team’s role on the project was the installation of industrial gases including L.P.G., argon, oxygen and compressed air.

 

 


Curtin University, Bentley Campus

Curtin University Pipe Installation

Commercial Pipe Installation installs heating water and chilled water pipework above ground and underground on campus.

Curtin University Underground Pipework Building 213 consisting of: 400mm Ø Stainless Steel pipe and 250mm Ø Black Steel pipe

 

 


Central Park, Perth

Central Park Pipe Installation

Alex was involved with the original air conditioning installation at the time Central Park was being constructed in 1990. At this time Matthew Hall Pty. Ltd was the contractor on site and Alex’s role was as a site supervisor.

After the completion of construction Alex has been involved with general maintenance on the air conditioning systems firstly with Matthew Hall and Otis and at present supporting CMS services with the larger pipework projects.

 


PWCS Stackers

PWCS Stackers Pipe Installation

Working with Firemain Co., Commercial Pipe Installation installed the fire hydrant and deluge pipework systems on two stackers that were fabricated by ThyssenKrupp in Henderson WA and transported by ship to Newcastle in NSW for the movement of coal at the harbour.

 


Sino Iron Chiller Skids

The chiller skid fabrication and pipework installation was undertaken with AHI Carrier for the Sino Iron project. Our team of skilled welders and pipe fitters completed the works in Perth for delivery to the Sino Iron site in Cape Preston.


Joondalup Health Campus

Working on the theatre block Commercial Pips installation completed the chilled, heating and condensate drain pipework. Our work also included the relocation of DX units and refrigeration pipework to several new units.

Client Testimonial On the project
“The comments from the State was that the project was one of the best they had seen. I would personally like to thank you all for your assistance."


Albany Health Campus

Commercial Pipe Installation working with John Holland Group completed the heating, chilled, diesel compressed air and refrigeration pipework for this project.

Albany Health Campus is, to date, the largest public country hospital development ever undertaken in Western Australia. Patients are now able to enjoy fully air conditioned and heated surrounds.


St. John of God Murdoch Redevelopment

The project comprised of several planned stages and the redevelopment saw the hospital's capacity increased by 174 beds. Additional new treatment facilities include eight operating theatres and an expanded medical clinic and cancer centre have allowed an additional 25,000 patients to be treated each year.

Our role in the expansion and refurbishment of St. John of God in Murdoch included the chilled, heating and steam services. Working together with Jako Industries, Commercial Pipe Installation has worked hard to ensure the highest standard of workmanship.


32 ST. Georges Terrace - May Holman Centre

Commercial Pipe Installation was part of the May Holman Centre building refurbishment along with the fit-outs for the tenancies. Working alongside the mechanical contractor, Triple M and the builder Probuild we were responsible for the installation of the supply and install chilled, heating and condenser water services


Brookfield Place Tower 2

Brookfield Place Tower 2 is part of the final stage in the Brookfield Place precinct and consists of 16 office levels.

Our works consisted of the supply and installation of Chilled, Heating, Condenser Water, Condensate and gas pipework during the build. Commercial Pipe Installation also completed some fit-outs on the tenancy levels