Case Studies

Burswood Peninsula Tower 1
The peninsula apartment
development is a Mirvac apartment
development overlooking the Swan
River at Burswood, consisting of a
number of apartment towers and
low rise apartments and town
houses.
Commercial Pipe Installation involvement on the project was on
Tower 1, on the installation of a
loop cooling water system, serving
air conditioning units in the
apartments which are served by
from a heat exchanger, cooling
tower and boiler plant located on
level 17 & 18.
HBF House
HBF Health Fund’s office building
in Murray Street, Perth underwent
a total refurbishment of the air
conditioning systems, while still
functioning as an operational office
building without affecting the
client’s staff and operation of the
business. A new chiller and boiler
plant was installed with new pipe
riser and AHU plants installed on a
floor by floor basis.
Commercial Pipe Installation’s involvement on the project was to
install new chilled & heating water
pipework.
Joondalup Shopping Centre  The existing shopping centre has undergone an extensive upgrade.
Located in the heart of Joondalup, this project comprises a major
expansion to the existing Lakeside Joondalup Shopping City. The
expansion of Lakeside is a two storey extension comprising of an
additional 29,000 square meters of retail and office floor space, with
the addition of a Big W Department Store, an IGA Supermarket and 100
new specialty shops. Commercial Pipe Installation involvement on the project was to install
condenser, chilled & heating water pipework from an upgraded chiller /
cooling tower plant and a new boiler plant, to serve the new specialty
shops, food court and malls.
CSIRO Waterford
At CSIRO Waterford the project consisted of an expansion and extension to the existing Koch and Becher Buildings. Works included a three-storey extension to the Koch Building, new administration wing, extensive laboratory fit out and re-configuration and the construction of a link bridge between the two buildings.
Commercial Pipe Installation’s role in the expansion was installing new chillers and associated pumps for CCW and chilled water. Our team also worked on the Laboratory gases including vacuum, compressed air, nitrogen, CO2, argon and oxygen.
Submarine Facility, Henderson
 The state-of-the-art facility represents a consolidation of all Western Australian submarine maintenance and upgrade activities.
Our team’s role on the project was the installation of industrial gases including L.P.G., argon, oxygen and compressed air.
Curtin University, Bentley Campus
 Commercial Pipe Installation installs heating water and chilled water pipework above ground and underground on campus.
Curtin University Underground Pipework Building 213 consisting of: 400mm Ø Stainless Steel pipe and 250mm Ø Black Steel pipe
Central Park, Perth
 Alex was involved with the original air conditioning installation at the time Central Park was being constructed in 1990. At this time Matthew Hall Pty. Ltd was the contractor on site and Alex’s role was as a site supervisor.
After the completion of construction Alex has been involved with general maintenance on the air conditioning systems firstly with Matthew Hall and Otis and at present supporting CMS services with the larger pipework projects.
PWCS Stackers
 Working with Firemain Co., Commercial Pipe Installation installed the fire hydrant and deluge pipework systems on two stackers that were fabricated by ThyssenKrupp in Henderson WA and transported by ship to Newcastle in NSW for the movement of coal at the harbour.
Sino Iron Chiller Skids
The chiller skid fabrication and
pipework installation was
undertaken with AHI Carrier for the
Sino Iron project. Our team of
skilled welders and pipe fitters
completed the works in Perth for
delivery to the Sino Iron site in
Cape Preston.
Joondalup Health Campus
Working on the theatre block Commercial Pips installation completed the
chilled, heating and condensate drain pipework. Our work also included
the relocation of DX units and refrigeration pipework to several new units. Client Testimonial On the project
“The comments from the State was that the project was one of the best they
had seen. I would personally like to thank you all for your assistance."
Albany Health Campus
Commercial Pipe Installation working with John Holland Group completed
the heating, chilled, diesel compressed air and refrigeration pipework for
this project.
Albany Health Campus is, to date, the largest public country hospital
development ever undertaken in Western Australia. Patients are now able
to enjoy fully air conditioned and heated surrounds.
St. John of God Murdoch Redevelopment
The project comprised of several
planned stages and the
redevelopment saw the hospital's
capacity increased by 174 beds.
Additional new treatment facilities
include eight operating theatres
and an expanded medical clinic
and cancer centre have allowed an
additional 25,000 patients to be
treated each year.
Our role in the expansion and
refurbishment of St. John of God in
Murdoch included the chilled,
heating and steam services.
Working together with Jako
Industries, Commercial Pipe
Installation has worked hard to
ensure the highest standard of
workmanship.
32 ST. Georges Terrace - May Holman Centre
Commercial Pipe Installation was
part of the May Holman Centre
building refurbishment along with
the fit-outs for the tenancies.
Working alongside the mechanical
contractor, Triple M and the builder
Probuild we were responsible for
the installation of the supply and
install chilled, heating and
condenser water services
Brookfield Place Tower 2
Brookfield Place Tower 2 is part of the final stage in the Brookfield
Place precinct and consists of 16 office levels.
Our works consisted of the supply and installation of Chilled, Heating,
Condenser Water, Condensate and gas pipework during the build.
Commercial Pipe Installation also completed some fit-outs on the
tenancy levels
|